Automation Systems
Engineering XC100/XC200

Device arrangement [t-head1-first]

Install the rack and the PLC horizontally in the control cabinet – as shown in the following figure.

 

Position 1Clearance > 50 mm

Position 2Clearance > 75 mm from active elements

Position 3Cable duct


Imprint © 2006 by Moeller GmbH   Top